Simulation of Cargo Rail Terminal for Irkutsk Oil Company

Simulation of multimodal (rail + truck) cargo terminal servicing a group of petrochemical plants of Irkutsk Oil Company in Ust-Kut, Eastern Siberia. The model was used to estimate throughput of the terminal with various number of rail tracks, locos and cranes. The terminal handles simultaneous inbound and outbound material flows which leads to multiple interactive constraints and makes simulation the only effective tool for «what-if» analysis.
Period: August 2018 – May 2019
Industry sector: Oil and Gas
Client / Partner: Irkutsk Oil Company (INK) / BRIGHT Group

Comments are closed.